Audits
PRD Comparison
Gap analysis — two PRDs vs current SynthralOS implementation
PRD Comparison Report
Auditor: Ibrahim Laeeq | Date: 2026-03-20
Summary
PRDs specify Temporal + ACI.dev + BetterAuth + Infisical. Current: Custom engine + Custom connectors + Clerk + Stubbed Infisical.
Key Gaps
- No Temporal — custom engine lacks durability/replay
- Infisical stubbed — methods do nothing
- No WorkflowVersion table
- 99 connector manifests but shallow implementations
- No ELT pipeline (Airbyte/Meltano/Singer absent)
- Only 1/12 waterfall routing rules implemented (Nango)
- Observability scaffolded but not deployed
Effort: P0+P1 = 60-85 days. Full compliance = 130-180 days.
Full report: backend/change_detectionio/PRD_COMPARISON_REPORT.md
Was this page helpful?
Last updated today
Built with Documentation.AI